St. Tammany Parish Fire District #2 -- HWY 1085 Station
Excavation, backfilling, grading, and construction of a new pre-engineered steel frame building.
Specifications
(click to expand/collapse)
Name | Size | ||
STP FPD#2 HWY 1085 STATION SPECS REV | 12.0 MB |