CALS INFRASTRUCTURE AND EQUIPMENT-LSU HEALTH SCIENCES CENTER
An elevated, covered pedestrian walk bridge connecting two structures on opposing sides of the street. Construction to be made out of structural concrete and structural steel.
Status
Accepting Bids
Prebid Date | 5/7/25 10:00am |
Bid Date | 5/21/25 2:00pm |
Location
2021 Perdido St. New Orleans, LA